Date |
Name of Vehicle / Test Article & Links to More Info on This Vehicle |
Photo |
Flight Test (FT) or Static Fire Test (SFT) |
Achievements/ Highlights |
| Sep 2006 | Prospector 7D (fourth P-7 flight) |
![]() |
P-7D FT |
- demonstrated operationally responsive launch for the Air Force (SMC, AFRL/PR) at the Navy's San Nicolas Island |
| Apr 2006 | Prospector 7C (third P-7 flight) |
![]() |
P-7C FT |
- commercially sponsored, operational RLV flight - manifested a payload for The Aerospace Corporation - evaluated responsive launch for the Air Force (SMC) |
| Oct 2005 | Prospector 7A (first
P-7 flight); Prospector 7B (second P-7 flight) |
![]() |
P-7A, -7B FT |
- sponsored by AFRL/PR under a Phase I SBIR - two flights with a single vehicle in 3.5 hours; - demonstration of rapid RLV-type turn-around launch ops; - multiple academic payloads |
| Oct 2005 | Static Fire Test 2005-01 |
|
SFT-2005-01 |
- verify replacement epoxy resin for ablative chamber liner; - initial test of multi-chamber aerospike thruster module |
| May 2005 | Prospector 6A / Kimbo XII* |
![]() |
P-6A FT |
- Full-scale, low-fidelity NLV prototype; - Stage separation and full vehicle recovery; - Wi Fi telemetry experiment; - Data logger experiment from Montana State University |
| Dec. 2004 | Prospector 5/ Kimbo XI * |
![]() |
P5/K-XI FT-1 |
- First launch and recovery of full-scale, low-fidelity prototype of the NLV first stage. |
| Oct. 2004 | LOX/Propylene Evaluation Test #3 |
![]() |
LOX/Propylene SFT-3 | - Validated revised ignition sequence. |
| June 2004 | LOX/Propylene Evaluation Test #2 |
![]() |
LOX/Propylene SFT-2 |
- Evaluated modified injector. - Validated upgraded
telemetry and |
| June 2004 | Prospector 4/ Kimbo-X * |
![]() |
P4 / K-X FT-2 |
Second Prospector 4 flight. Evaluated new all-ablative chamber design. Manifested USC Traveler payload. Total recovery failure due to breakdown in configuration management. |
| Mar. 2004 | LOX/Propylene Evaluation Test |
![]() |
Propylene SFT-1 |
First tests with LOX/Propylene. Validated general propylene handling procedures. Validated new telemetry and command architecture. |
| Dec. 2003 | Prospector 4/ Kimbo-X * |
![]() |
P4 / K-X FT-1 |
Second liquid-propellant aerospike flight test. Complete burn-to-depletion. Complete vehicle recovery |
| Sept. 2003 | Prospector 2/ Kimbo-VII-A* |
![]() |
P2 / K-VII FT-2 |
First known flight test of a powered liquid-propellant aerospike engine. Re-flight of Prospector 2 vehicle. |
| June 2003 | CSULB Aerospike 2 SFT-1 |
|
AS2- SFT-1 |
Validated CSULB design modifications. 4 second burn validated engine for flight test with P-2. Demonstrated new avionics control elements. |
| Feb. 2003 | Prospector 3 / Kimbo-VIII * | P3 / K-VIII FT-1 |
Use of Thrust Vector Control (TVC). 100% successful recovery. Two USC payloads Upgraded ground support equip. |
|
|
Sept. 2002 |
TVC Engine
|
K-VIII SFT-1 |
Validated electro-mechanical actuator and servo controllers for thrust vector control (TVC). |
|
|
Apr. 2002 |
Aerospike Engine
|
K-VII SFT-2 |
Use of enhanced Static Fire Test Assembly (SFTA). Demonstrated successful ignition sequence. |
|
|
Jan. 2002 |
![]() |
P2 / K-VII FT-1 |
Composite aeroshell (provided by Advanced Composite Products Technology). New CSULB student engine (1 klbf). 100% successful recovery. Stanford University payload. |
|
|
Dec. 2001 |
Prospector 2 / Kimbo-VII * |
![]() |
P2 / K-VII SFT-1 |
Certified P-2 propulsion system, engine First static fire test on Vertical Test Stand-2 |
|
Dec. 2001 |
Kimbo-IX |
K-IX FT-1 |
Joint project with Eric Claypool. Propulsion system under-performance. |
|
|
June 2001 |
P1 / K-VI FT-1 |
First CSULB mission. 100% successful recovery. Analog telemetry experiment.. |
||
|
May 2001 |
K-VI SFT-1, K-VI SFT-2 |
Checked out new SFTA. Validated composite chamber. Validated CSULB student design. |
||
|
Feb. 2001 |
K-V FT-1 |
Validated simplified vehicle design. 100% successful recovery. |
||
|
June 2000 |
K-IV FT-1 |
First ever flight of composite LOX tank. Space News article published. |
||
|
Apr. 2000 |
![]() |
K-IV SFT-1 |
Validated integration of composite LOX tank; (tank provided by Microcosm, Inc.). |
|
|
Feb. 2000 |
K-III FT-1 |
Validated skin-and-stringer structure. GPS data log. Partial recovery. |
||
|
Oct. 1999 |
K-III SFT-2 |
Validated propulsion system adjustments. |
||
|
??? 1999 |
![]() |
K-III SFT-1 |
Evaluated improved ablative engine chamber. Thrust Vector Control with pneumatic actuator. New Electrical Ground Support Equipment. |
|
|
Aug. 1998 |
K-II FT-1 |
Incorporated regulated pressure system. |
||
|
May 1998 |
K-I FT-1 |
Validated basic vehicle design. Partial recovery. |
||
|
Feb. 1998 |
K-I SFT-1 |
Initial propulsion system ablative engine test. |
* "Prospector" is the name used by CSULB for its set of test vehicles, whereas GSC employs the "Kimbo" title for all the vehicles it is involved with, which includes the Prospectors developed in partnership with CSULB, as well as those implemented on other projects.
Last Updated: 02 March 2007